Cambodia to Invest $1B in Hydroelectricity
A 400 megawatt hydroelectric power plant will be put into operation on July
15 in Stung Treng.
The Lower Sesan 2 Hydropower Plant in Steung Treng province, the largest in
Cambodia, will undergo trials beginning July 15. The official watergate
closing ceremony is slated for September 25, 2017.
"This is a great achievement of the Royal Government of Cambodia. It lends
more stability and quality to the power grid," stated Electricite Du
Cambodge (EDC)
The Lower Sesan 2 hydropower project is a joint project between the Chinese
investment firm Hydrolancang International Energy (51%), Cambodia's Royal
Group (39%) and EVN from Vietnam (10%).
It sits on 36,000 hectares and has an altitude of 80 meters, with a height
of 75 meters for storing water and 5 meters for preventing the risk from
over-high-altitude water levels.
As estimated, it will be able to provide tax revenues to the state at US$30
million annually.
Under the agreement between the investment firms and the government, after
40 years of operation, the Lower Sesan 2 Hydroelectric Project operations
and maintenance will be transferred to the government, which reflects the
significant contribution of private company to the government.
--- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Link to Original Article:
http://en.freshnewsasia.com/index.php/4891-cambodia-to-invest-1b-in-hydroele
ctricity.html
--- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
John Diecker
APT Consulting Group Co., Ltd.
www.aptthailand.com
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.